[ Page 1 ] [ Page 2 ] [ Page 3 ] [ Page 4 ] [ Page 5 ]
Everything is now properly and firmly mortised. As soon as the wood is completely dried, the remained gaps and spaces will be filled and glued. |
Everything is now properly and firmly mortised. As soon as the wood is completely dried, the remained gaps and spaces will be filled and glued. |
To some extend, it wasn't much room for working. But, what wouldn't do someone just for the precision. |
To some extend, it wasn't much room for working. But, what wouldn't do someone just for the precision. |
18 floor joists I have been inserted this year and therefore covered slightly more than a third of the living room. However, more important for me is, that I know now how much material I need for it. |
18 floor joists I have been inserted this year and therefore covered slightly more than a third of the living room. However, more important for me is, that I know now how much material I need for it. |
Panorama picture of the whole house with the view from northwest. This time I spared most of the space inside the house from storage purposes. |
Panorama picture of the whole house with the view from northwest. This time I spared most of the space inside the house from storage purposes. |
The log yard is filled up really good again. Approximately 750ft of dried logs become available to me next year. |
The log yard is filled up really good again. Approximately 750ft of dried logs become available to me next year. |
That considerable pile is the cumulated bark from last year and this. Due to the heat and drought, we were not allowed to burn anything this year. |
That considerable pile is the cumulated bark from last year and this. Due to the heat and drought, we were not allowed to burn anything this year. |
The living and dining room area photographed from an airy southeastern position in the early afternoon. |
The living and dining room area photographed from an airy southeastern position in the early afternoon. |
One glance from northeast, too. A last log has to come onto the log yard and afterwards the disassembly of the crane begins. |
One glance from northeast, too. A last log has to come onto the log yard and afterwards the disassembly of the crane begins. |
Panorama picture of the house from North
Panorama picture of the house from North |
The facts of the year:
In general for this year I accomplished again more than I had planned - a reason for that could have been the fabulous weather. In spite of that I lost 8 days due to various circumstances like building the spot for the container, broken crane, help at moving friends or thunderstorms. 39 wall logs and 18 floor joists or 57 logs = 552ft I was able to install. In total I consumed 75 l gasoline and 16 l chainsaw oil. However, this time just 125 dollars were invested in material costs.
Comparison end of 2015 and end of 2016
Comparison end of 2015 and end of 2016 |
Continuation follows... in 2017
|